Scafftag and scaffold inspection service from £100 per visit.

The scafftag system is wildly used in the scaffolding industry and by our company as standard on all our installations and this is now our company policy for scaffold inspection and documenting health and safety on site.

This system is used by us to sign off and inspect structures every seven days or after adverse weather to check the strength, safety and stability and to make sure the components have not been moved by an unqualified person. Worthing-20120211-00185
The card provides all the information relating to the loadings that can be imposed on the platform with boxes to tick to show the loading the structure is capable of holding from 0.75kn per sq m which covers light duty works such as painting though to support scaffolds with loadings as high as 3kn per sq m and these cards also include the installers details and an emergency contact number should there be a problem with the structure erected.
The date of installation is shown and seven days from this date is when the inspections need to take place. The holder can also be used as a incomplete sign before the inspection card is installed warning other site operatives that the structure is unsafe for use and should not be used.
There are over 40 scafftags products covering ladders, mobile towers and fall arrest equipment. Other scafftag products include nanotag for harness inspections, microtag for pat testing and the towertag for alloy towers. We can supply all these products and scaffold inspection service with any type of installation we provide though many of the different services we offer.